四川水力发电2024,Vol.43Issue(z2):9-12,34,5.
高速铁路预制梁场的沉降观测与控制
Settlement Observation and Control of the High-speed Railway Precast Beam Yard
陈换宁 1张达志 1任小强 1刘明辰1
作者信息
- 1. 中国水利水电第五工程局有限公司,四川 成都 610066
- 折叠
摘要
Abstract
Settlement observation is crucial in the entire construction and production process of the high-speed railway precast beam construction yard.Combined with the construction of the Linqing precast beam yard of the Xiongshang High-speed Railway,this paper provides stable,safe and reliable data support for the construc-tion of the precast beam yard through the observation point and level point setting,observation method,data a-nalysis and control,so as to ensure the construction quality of the project.关键词
大型临时设施/沉降观测/数据分析/精度/雄商高铁/临清制梁场Key words
Large temporary facilities/Settlement observation/Data analysis/Accuracy/Xiongshang High-speed Railway/Linqing precast beam yard分类
交通运输引用本文复制引用
陈换宁,张达志,任小强,刘明辰..高速铁路预制梁场的沉降观测与控制[J].四川水力发电,2024,43(z2):9-12,34,5.