| 注册
首页|期刊导航|四川水力发电|不良地质条件下特大断面水工隧洞口开挖支护施工措施探索

不良地质条件下特大断面水工隧洞口开挖支护施工措施探索

刘猛

四川水力发电2024,Vol.43Issue(z2):71-73,99,4.
四川水力发电2024,Vol.43Issue(z2):71-73,99,4.

不良地质条件下特大断面水工隧洞口开挖支护施工措施探索

Exploration on the Construction Measures for Excavation and Support of Super Large Section Hydraulic Tunnel Portal under Adverse Geological Conditions

刘猛1

作者信息

  • 1. 中国安能建设集团有限公司,北京 100055
  • 折叠

摘要

Abstract

In the construction process of hydropower projects,excavation and support of hydraulic tunnel open-ings are usually the focus and difficulty of construction control.When encountering situations where the super large section hydraulic tunnel openings are set in unfavorable geological zones,there will be greater uncertainty and hidden dangers in the safety,quality,and progress control of excavation and support construction.Based on the the measures taken during the excavation and support construction process of a diversion tunnel portal of a hydropower project in the Dadu River Basin,this paper expounds exploration on the construction measures for excavation and support of super large section hydraulic tunnel portal under adverse geological condition in order to provide reference for similar projects under unfavorable geological conditions.

关键词

不良地质条件/特大断面/水工隧洞/开挖支护/施工措施

Key words

Adverse geological conditions/Super-large section/Hydraulic tunnel/Excavation support/Construc-tion measures

分类

建筑与水利

引用本文复制引用

刘猛..不良地质条件下特大断面水工隧洞口开挖支护施工措施探索[J].四川水力发电,2024,43(z2):71-73,99,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文