太阳能Issue(11):106-112,7.DOI:10.19911/j.1003-0417.tyn20240823.01
华能德州水上漂浮式光伏发电项目施工难点解决方案浅析
ANALYSIS OF CONSTRUCTION DIFFICULTIES AND SOLUTIONS FOR FLOATING PV POWER GENERATION PROJECT OF HUANENG DEZHOU
摘要
Abstract
Most floating PV power stations both domestically and internationally are small-scale projects with simple environmental conditions,so their existing project experience is insufficient to provide reference for large-scale similar projects.This paper provides a detailed introduction to the design and implementation process of the Huaneng Dezhou Dingzhuang Reservoir PV power generation project,summarizes and extracts the design experience and key points of similar PV power stations,improves relevant design details,explores the construction difficulties of large-scale floating PV power stations,provides solutions,and verifies them.The results show that the provided solution greatly increases the upper limit of the size of floating PV arrays,reduces the impact on the water environment,saves investment costs,and provides valuable experience and reference for the future development of floating PV power stations.关键词
水上漂浮式光伏电站/光伏方阵/施工难点/设计要点/设计细节Key words
floating PV power station/PV array/construction difficulties/design key points/design details分类
信息技术与安全科学引用本文复制引用
马骥,李振兴,杨俊虎,阎宇晶,周建婷..华能德州水上漂浮式光伏发电项目施工难点解决方案浅析[J].太阳能,2024,(11):106-112,7.基金项目
近海漂浮式光伏关键技术研究与新型技术应用研究(CEEC2022-ZDYF-04) (CEEC2022-ZDYF-04)