| 注册
首页|期刊导航|云南水力发电|用水文站实测资料验证广东省综合单位线法设计洪水精度

用水文站实测资料验证广东省综合单位线法设计洪水精度

李弘力

云南水力发电2024,Vol.40Issue(11):26-28,48,4.
云南水力发电2024,Vol.40Issue(11):26-28,48,4.DOI:10.3969/j.issn.1006-3951.2024.11.007

用水文站实测资料验证广东省综合单位线法设计洪水精度

Verify the Accuracy of Comprehensive Unit Line Method for Designing Floods in Guangdong Province using Measured Data from Hydrological Stations

李弘力1

作者信息

  • 1. 广东省水文局湛江水文分局,广东 湛江 524000
  • 折叠

摘要

Abstract

With the development of society,the frequency of floods is increasing.Especially in areas with frequent mountain floods,where rivers rise rapidly and converge quickly,precise flood warnings must be made before the arrival of floods.How to determine the scale of floods and make good plans for water conservancy engineering construction has always been a problem that troubles people.The comprehensive unit line method in Guangdong Province is of great significance in dealing with the above two issues.The article compares and analyzes the frequency calculation of floods using the measured flow data from the Duling Hydrological Station with the results obtained using Guangdong Province Comprehensive Unit Line Method,in order to verify the accuracy of Guangdong Province Comprehensive Unit Line Method in calculating floods.

关键词

设计洪水/广东省综合单位线法/经验适线法

Key words

design flood/Guangdong Province Comprehensive Unit Line Method/experience based line fitting method

分类

建筑与水利

引用本文复制引用

李弘力..用水文站实测资料验证广东省综合单位线法设计洪水精度[J].云南水力发电,2024,40(11):26-28,48,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文