| 注册
首页|期刊导航|云南水力发电|产业园区规划水资源论证需水预测方法实例分析

产业园区规划水资源论证需水预测方法实例分析

杨成全 韩玉龙

云南水力发电2024,Vol.40Issue(11):29-33,5.
云南水力发电2024,Vol.40Issue(11):29-33,5.DOI:10.3969/j.issn.1006-3951.2024.11.008

产业园区规划水资源论证需水预测方法实例分析

Case Study on Water Resource Demonstration and Demand Forecasting Method for Industrial Park Planning

杨成全 1韩玉龙1

作者信息

  • 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
  • 折叠

摘要

Abstract

Planning water resource demonstration is one of the key tasks in the construction of a water-saving society in China.It mainly aims to meet the water demand for the development of various industrial parks,optimize the allocation of water resources in the parks,and plan the water requirements for the development of industrial parks through scientific and reasonable methods,so as to coordinate the allocation of water resources.The article takes Anyang High tech Industrial Park as an example to deeply analyze the water demand structure of the industrial park.Three different methods are used to predict the water demand,and through the rationality analysis of the prediction results,the most reliable water demand prediction method is determined in the water resource planning demonstration of the park.Through comprehensive analysis,it can be concluded that the quota method is the most suitable for the allocation of water resources in the park's planning and development.The planned water demand for the park by 2030 is 515×104 m3/a,and by 2040 it is 917×104 m3/a.

关键词

产业园区/水资源配置/规划水资源论证/需水结构/需水预测

Key words

industrial park/water resource allocation/planning water resources demonstration/water demand structure/water demand forecast

分类

建筑与水利

引用本文复制引用

杨成全,韩玉龙..产业园区规划水资源论证需水预测方法实例分析[J].云南水力发电,2024,40(11):29-33,5.

云南水力发电

1006-3951

访问量3
|
下载量0
段落导航相关论文