| 注册
首页|期刊导航|云南水力发电|抽蓄电站综合加工厂标准化建设与应用

抽蓄电站综合加工厂标准化建设与应用

张任兵

云南水力发电2024,Vol.40Issue(11):149-152,4.
云南水力发电2024,Vol.40Issue(11):149-152,4.DOI:10.3969/j.issn.1006-3951.2024.11.036

抽蓄电站综合加工厂标准化建设与应用

Standardization Construction and Application of Integrated Processing Plants for Pumped Storage Power Station

张任兵1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The construction of pumped storage power stations involves a large number and types of steel reinforcement and steel structure processing.The construction of intelligent,mechanized,and standardized comprehensive processing plants is also a top priority of the project.It is a window for construction units to showcase their culture to the outside world and a place for enterprises to showcase their culture.The standardized implementation of management can vigorously promote the construction of modern professional teams,fundamentally achieve management guarantee for the construction process,and thus help improve the management level,technical strength level,and image level of construction enterprises.

关键词

加工厂/运行管理/标准化/规划布置

Key words

processing plant/operation management/standardization/planning and layout

分类

建筑与水利

引用本文复制引用

张任兵..抽蓄电站综合加工厂标准化建设与应用[J].云南水力发电,2024,40(11):149-152,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文