摘要
Abstract
The study focuses on the identification,evaluation,and management of risk factors in water conservancy project bidding under the PMC(Project Management Contracting)model.It provides a detailed analysis of various risk factors that may be faced during the bidding stage,such as contract document preparation,EPC contractor selection,and design management.On this basis,a risk assessment index system was constructed and a fuzzy comprehensive evaluation method was introduced to better handle the uncertainty and fuzziness in the evaluation process.In terms of methodology,the design principles of comprehensiveness,independence,comparability,and operability have been followed,and a clear hierarchical structure model has been established,including the objective layer,indicator layer,and criterion layer.At the same time,methods such as fuzzy judgment matrix and likelihood calculation were used to conduct in-depth analysis and ranking of risk factors,providing scientific basis for project decision-making.关键词
项目管理承包模式/水利工程/招标风险评价Key words
project management contracting mode/water conservancy engineering/bidding risk assessment分类
建筑与水利