摘要

Abstract

New desert energy bases require long-distance high-voltage direct current(HVDC)to send clean power to load centers.Accurate and efficient evaluation of the total transfer capability(TTC)of AC-DC hybrid transmission systems is significant for system security planning and promoting new energy consumption.To this end,this study proposes a method for evaluating the maximum transmission capacity of the AC-DC outgoing transmission systems of new desert energy bases,considering the uncertainty of the new energy output.First,Latin hypercube sampling was used to construct an uncertainty model of wind power output,and a typical scenario set was generated based on the improved K-means clustering method.Second,a probabilistic continuous power flow iteration algorithm model of the AC-DC hybrid system was established.The influence factor of DC power was introduced to accelerate the convergence of the power flow and improve the accuracy of the calculation.Finally,a TTC calculation model of the AC-DC hybrid delivery system for a new desert energy base is constructed,which considers the uncertainty of wind power output and achieves accurate and fast TTC evaluation of the AC-DC hybrid system.The modified IEEE39-node system is used for example analysis,which verifies that the proposed method can guarantee the accuracy and timeliness of TTC evaluation under uncertain scenarios of new energy output and provides a reference for improving the safety and stability of the AC-DC hybrid delivery system of a large-scale new energy base.

关键词

最大传输能力/交直流混合系统/风电不确定性/概率连续潮流/沙戈荒新能源基地

Key words

total transmission capacity/AC-DC hybrid system/wind power uncertainty/probabilistic continuous power flow/desert new energy base

分类

信息技术与安全科学

引用本文复制引用

张艳,张旭,张静怡,顾盼,刘春明,刘山河..考虑风电不确定性的沙戈荒新能源基地交直流混合外送系统最大传输能力评估[J].电力建设,2024,45(12):174-186,13.

基金项目

This work is supported by State Grid Corporation of China Research Program(No.5108-202218280A-2-267-XG). 国家电网公司总部科技项目"沙漠戈壁荒漠新能源基地及外送系统安全稳定特性及规划技术研究"(5108-202218280A-2-267-XG) (No.5108-202218280A-2-267-XG)

电力建设

OA北大核心CSTPCD

1000-7229

访问量0
|
下载量0
段落导航相关论文