计及不确定性因素影响的变电站220kV侧检修规划

张侃君 王婷 周虎兵 黎恒烜 李晨 唐爱红

高电压技术2024,Vol.50Issue(11):4812-4825,中插1,15.
高电压技术2024,Vol.50Issue(11):4812-4825,中插1,15.DOI:10.13336/j.1003-6520.hve.20231237

计及不确定性因素影响的变电站220kV侧检修规划

Maintenance Planning of 220 kV Side in Substation Considering Uncertain Factors

张侃君 1王婷 1周虎兵 1黎恒烜 1李晨 2唐爱红2

作者信息

  • 1. 国网湖北省电力有限公司电力科学研究院,武汉 430077
  • 2. 武汉理工大学自动化学院,武汉 430070
  • 折叠

摘要

Abstract

As the integration of high proportions of renewable energy sources into the grid increases,the power fluctua-tions on the supply side increase.During maintenance of the 220 kV side in a substation,the power grid operation faces more uncertainty and risks,which demands higher requirements for robustness in maintenance planning.However,cur-rently there are no mature methods to assist in the development of maintenance plans that can adapt to the complex and changing transmission environment of the 220 kV side in a substation.To address this issue,this paper first builds a de-terministic model for substation maintenance planning on the 220 kV side based on the transmission network planning theory and engineering practice experience.The model considers the optimization objective of economic cost and the re-liability of the system's operation during maintenance,and takes into account maintenance project constraints and power grid flow safety conditions.Furthermore,by using the probability-driven self-adaptive robust optimization theory,renew-able energy output and equipment failures are incorporated as uncertain factors into the aforementioned deterministic model,thus a maintenance planning model for the 220 kV side of a substation that considers the effects of uncertainty factors can be obtained.The model is optimized based on the benders decomposition and linear programming theory to improve the accuracy and speed of the model solution.The effectiveness of the model is verified by analyzing the maintenance planning of an improved IEEE-RTS79 example and a real case in the power grid.

关键词

变电站220kV侧检修/输电网规划/不确定性因素/鲁棒优化/benders

Key words

maintenance of 220 kV side in substation/transmission system planning/uncertain factors/Robust optimi-zation/benders

引用本文复制引用

张侃君,王婷,周虎兵,黎恒烜,李晨,唐爱红..计及不确定性因素影响的变电站220kV侧检修规划[J].高电压技术,2024,50(11):4812-4825,中插1,15.

基金项目

湖北省重点研发计划(2023BAB002) (2023BAB002)

国网湖北省电力有限公司科技项目(52153223000A).Project supported by Key R&D Program of Hubei Province(2023BAB002),Science and Technology Project of State Grid Hubei Electric Power Co.,Ltd.(52153223000A). (52153223000A)

高电压技术

OA北大核心CSTPCD

1003-6520

访问量0
|
下载量0
段落导航相关论文