Berths 8&9 at Jiangyin harbor of Fuzhou port are the first two zero-emission and fully electric wharves in Fuzhou port.Based on the design concept of green and low-carbon port,a series of key technologies were studied and applied,including short&long term planning of wharf's functions,fully electric techniques of technological equipment,the reuse techniques for the construction waste and spoil soil coming from land formation,and the techniques of sharing a trench by water and power pipelines.The above results enhanced the competitiveness of the terminal,achieved environmental,economic,and social benefits,and realized green and low-carbon target across an entire lifecycle of design,construction,operation and maintenance.The key advanced technologies could be applied in the design of similar waterway projects.

关键词

零排放/全电动码头/弃土/建筑垃圾/水电共沟

Key words

zero emission/fully electric wharf/spoil soil/construction waste/trenches shared by water and power pipelines