| 注册
首页|期刊导航|江西建材|复杂外部建设条件下开放式盾构法在地下工程中的实践探索

复杂外部建设条件下开放式盾构法在地下工程中的实践探索

蔡斌

江西建材Issue(9):258-260,3.
江西建材Issue(9):258-260,3.

复杂外部建设条件下开放式盾构法在地下工程中的实践探索

Practical Exploration on Open Shield Tunneling in Underground Engineering under Complex External Construction Conditions

蔡斌1

作者信息

  • 1. 南京城市建设管理集团有限公司,江苏 南京 210000
  • 折叠

摘要

Abstract

This article takes the implementation of the Xinzhuang underground crossing project as the background.The project is located at the intersection of multiple main roads,with existing elevated bridges above ground and subways as well as pipelines under ground.The external conditions for construction are relatively complex.The project is the first underground crossing project in the country to use the open shield tun-neling method for construction.By introducing the open shield tunneling method,analyzing its advantages,and introducing the construction process,the feasibility of using the open shield tunneling method in underground engineering under complex external conditions is explored.And also based on practical experience the existing problems of the method are analyzed.

关键词

开放式盾构/地下工程/复杂外部建设条件

Key words

Open shield tunneling/Underground engineering/Complex external construction conditions

分类

建筑与水利

引用本文复制引用

蔡斌..复杂外部建设条件下开放式盾构法在地下工程中的实践探索[J].江西建材,2024,(9):258-260,3.

江西建材

1006-2890

访问量0
|
下载量0
段落导航相关论文