| 注册
首页|期刊导航|江西建材|大体积混凝土底板跳仓法施工及温度应力分析

大体积混凝土底板跳仓法施工及温度应力分析

韩彬

江西建材Issue(9):277-280,4.
江西建材Issue(9):277-280,4.

大体积混凝土底板跳仓法施工及温度应力分析

Construction and Temperature Stress Analysis of Large Volume Concrete Floor Jumping Bin Method

韩彬1

作者信息

  • 1. 福建省二建建设集团有限公司,福建 福州 350000
  • 折叠

摘要

Abstract

In order to study the construction technology and temperature stress of jump-off method of large volume concrete floor.This paper takes a commercial office building in Fujian as an example,establishes a model by ANSYS finite element software,simulates and analyzes the temperature field and temperature stress of mass concrete under the construction of bin hopping method,reveals the formation mechanism of temperature stress and its influencing factors,and proposes an optimal construction scheme to reduce temperature stress and ensure the safety and durability of the structure.

关键词

大体积混凝土/跳仓法施工/施工技术/温度应力

Key words

Mass coagulation/Construction by jumping warehouse/Construction technology/Temperature stress

分类

建筑与水利

引用本文复制引用

韩彬..大体积混凝土底板跳仓法施工及温度应力分析[J].江西建材,2024,(9):277-280,4.

江西建材

1006-2890

访问量0
|
下载量0
段落导航相关论文