| 注册
首页|期刊导航|河北工业科技|内蒙古地区大体积混凝土挡墙施工温控分析

内蒙古地区大体积混凝土挡墙施工温控分析

刘卫然 吴昊天 韩建田 方斌 于海丰 高任清

河北工业科技2024,Vol.41Issue(6):443-449,7.
河北工业科技2024,Vol.41Issue(6):443-449,7.DOI:10.7535/hbgykj.2024yx06006

内蒙古地区大体积混凝土挡墙施工温控分析

Temperature control analysis of mass concrete retaining wall construction in Inner Mongolia region

刘卫然 1吴昊天 2韩建田 3方斌 4于海丰 1高任清3

作者信息

  • 1. 河北科技大学建筑工程学院,河北 石家庄 050018||河北省岩土与结构体系防灾减灾技术创新中心(筹),河北 石家庄 050018||智能低碳装配式建筑技术研究中心,河北 石家庄 050018
  • 2. 河北科技大学建筑工程学院,河北 石家庄 050018
  • 3. 河北省第四建筑工程有限公司,河北 石家庄 050051
  • 4. 河北省绿色建筑推广与建设工程标准编制中心,河北 石家庄 050011
  • 折叠

摘要

Abstract

To reduce the early cracking risk in mass concrete retaining walls in windy and arid areas and ensure the overall construction quality,the concrete retaining wall for coal collection operation of a coking plant in Inner Mongolia was taken as an example to carry out a parametic analysis on the parameters(including the installation of cold water piper,the length,height and thickness of retaining wall)by utilizing the finite element method.In this way,the temperature and stress fields after pouring were determined.Furthermore,the on-site temperature monitoring was performed as well.The results indicate that installing cold water pipes can effectively reduce internal temperatures and temperature differentials within the concrete retaining wall.Shrinkage stress increases when the length is less than 30 m,and remains relatively stable when it is greater than 30 m.Besides,when the height exceeds 4 m or the thickness exceeds 1.5 m,the shrinkage stress is close to the tensile strength,and the risk of cracking also increases accordingly.On site temperature monitoring indicates that the maximum temperature drop inside the concrete under the action of the cold water pipe is 6.6℃and the maximum temperature differential on the surface decreases by 4.7℃.The finite element simulation results are consistent with the actual monitoring results.The research results can provide reference for the design of the concrete retaining walls in windy and arid areas.

关键词

墙体工程/大体积混凝土/水化热/收缩应力/有限元

Key words

wall engineering/mass concrete/hydration heat/shrinkage stress/finite element

分类

建筑与水利

引用本文复制引用

刘卫然,吴昊天,韩建田,方斌,于海丰,高任清..内蒙古地区大体积混凝土挡墙施工温控分析[J].河北工业科技,2024,41(6):443-449,7.

基金项目

河北省自然科学基金(E2021208010) (E2021208010)

中央引导地方科技发展资金项目(236Z5408G) (236Z5408G)

河北省高等学校科学技术研究项目(CXY2024045) (CXY2024045)

河北工业科技

OACSTPCD

1008-1534

访问量0
|
下载量0
段落导航相关论文