河南水利与南水北调2024,Vol.53Issue(11):49-51,3.
大坝闸墩预应力自锁锚杆加固方案应力分析
Stress Analysis of Dam Pier Reinforced by Prestressed Self-locking Anchor
廖杰洪 1谭星舟2
作者信息
- 1. 武汉巨成结构集团股份有限公司,武汉 430233
- 2. 武汉巨成结构集团股份有限公司,武汉 430233||武汉大学检测与加固教育部工程研究中心,武汉 430072
- 折叠
摘要
Abstract
When an existing hydroelectric power station is used as the lower reservoir of a pumped-storage power station,the water level rises and the thrust of the gate increases,resulting in the bearing capacity of the existing gate piers fail to meet the requirements.In this paper,a scheme of installing super-large prestressed self-locking anchor bar is proposed.The finite element analysis method is used to analyze the prestressed self-locking anchoring scheme,and the analysis results show that the method could effectively reduce the maximum tensile stress of the piers.关键词
预应力/扩孔自锁锚杆/抽水蓄能/闸墩/水电站Key words
pre-stressed/self-locking anchor bar/pumped storage/gate piers/hydropower station分类
建筑与水利引用本文复制引用
廖杰洪,谭星舟..大坝闸墩预应力自锁锚杆加固方案应力分析[J].河南水利与南水北调,2024,53(11):49-51,3.