| 注册
首页|期刊导航|江淮水利科技|深层搅拌桩防渗墙在堤防加固中的应用及防渗效果分析

深层搅拌桩防渗墙在堤防加固中的应用及防渗效果分析

李聪磊

江淮水利科技Issue(5):21-25,5.
江淮水利科技Issue(5):21-25,5.DOI:10.20011/j.cnki.JHWR.202405005

深层搅拌桩防渗墙在堤防加固中的应用及防渗效果分析

Application and seepage control effectiveness analysis of deep mixing pile cutoff walls in levee reinforcement

李聪磊1

作者信息

  • 1. 安徽省水利水电勘测设计研究总院股份有限公司,安徽 合肥 230088
  • 折叠

摘要

Abstract

Seepage failure is one of the common hazards in levees.To analyze the applicability of deep mixing pile cutoff walls in levee hazard mitigation,this study used the seepage control and reinforcement project of the Donggang Baozhuang weir levee in the Dongfeng Lake floodplain area of the Huaihe River Basin,Anhui Province,as a case example.After a thorough analysis of the causes of leakage,multiple solutions were comprehensively compared,and a multi-head small-diameter deep mixing pile cutoff wall was selected for seepage treatment.The quality of the constructed wall was then tested.Using the two-dimensional stable seepage finite element method,the seepage control effect and seepage patterns of the cutoff wall were further analyzed and discussed through comparisons.The results showed that in the multi-layered shallow levee foundation of Donggang Baozhuang weir,the multi-head,small-diameter deep mixing pile cutoff wall had significant advantages in terms of wall quali-ty,technical conditions,and project cost.The solution was feasible and technically reliable.The semi-enclosed cutoff wall treatment had ideal performance and could be considered as the preferred seepage control measure for the levee foundation.The research findings provided a reference for seepage reinforcement of similar levees in the Huaihe River flood control areas.

关键词

深层搅拌桩防渗墙/多头小直径/有限单元法/渗流计算/堤防加固

Key words

deep mixing pile cut-off wall/multi-head small diameter/finit element method/seepage calculation/dike rein-forecement

分类

建筑与水利

引用本文复制引用

李聪磊..深层搅拌桩防渗墙在堤防加固中的应用及防渗效果分析[J].江淮水利科技,2024,(5):21-25,5.

江淮水利科技

1673-4688

访问量2
|
下载量0
段落导航相关论文