| 注册
首页|期刊导航|市政技术|双层斜拉桥主桥钢桁梁方案设计

双层斜拉桥主桥钢桁梁方案设计

黄毅东

市政技术2024,Vol.42Issue(12):167-173,7.
市政技术2024,Vol.42Issue(12):167-173,7.DOI:10.19922/j.1009-7767.2024.12.167

双层斜拉桥主桥钢桁梁方案设计

Design of Steel Truss Girder for the Main Bridge of Double-decks Cable-stayed Bridge

黄毅东1

作者信息

  • 1. 广东省交通规划设计研究院集团股份有限公司,广东 广州 510507
  • 折叠

摘要

Abstract

The main bridge of Xiangshan Bridge in Zhongshan,Guangdong Province is a double-decks steel truss cable-stayed bridge,the pylons are concrete structure resembling the Chinese character"Ren",supported by bored piles,the stay cables are composed of high-strength Zn-Al alloy coated parallel steel wires,constraint system is half-floating system with longitudinal damper.After comparison and selection,the main girder consists of two N-shaped steel trusses was determined;Both the upper chords and lower chords are box cross-section with stiffeners.The web members are H shape cross-section or box cross-section with stiffeners.The crossbeams are fish-belly shaped beams;Under the range of 187.2 m side span,concrete deck panels serve as counterweight,and the remain-ing upper and lower decks are installed with orthotropic steel plates;The side spans of the main bridge and part of the mid-span girders on shallow shoal are constructed by incremental launching,and the overall lifting cantilever as-sembly construction of large section is applied for the remaining trusses.The standard lifted section is 25.6 m;Apart from welding the upper flange of the chords and deck panels,the remaining components are connected by high-strength bolts.The relevant conclusions provide a reference for the design of similar double-decks steel truss girder cable-stayed bridges for highways.

关键词

斜拉桥/钢桁梁/正交异性钢桥面板/双主桁/三主桁

Key words

cable-stayed bridge/steel truss girder/orthotropic steel bridge deck/two-main-truss/three-main-truss

分类

交通工程

引用本文复制引用

黄毅东..双层斜拉桥主桥钢桁梁方案设计[J].市政技术,2024,42(12):167-173,7.

市政技术

1009-7767

访问量0
|
下载量0
段落导航相关论文