首页|期刊导航|西南交通大学学报|大矢跨比开口球壳的施工过程优化分析与监测

大矢跨比开口球壳的施工过程优化分析与监测

石开荣 林志毅 姜正荣 陈春光 陈一乔 梁军

西南交通大学学报2024,Vol.59Issue(6):1440-1447,1486,9.
西南交通大学学报2024,Vol.59Issue(6):1440-1447,1486,9.DOI:10.3969/j.issn.0258-2724.20220228

大矢跨比开口球壳的施工过程优化分析与监测

Optimization Analysis and Monitoring of Construction Process of Open Spherical Reticulated Shell Structure with a Large Rise-to-Span Ratio

石开荣 1林志毅 2姜正荣 1陈春光 3陈一乔 3梁军3

作者信息

  • 1. 华南理工大学土木与交通学院,广东 广州 510640||华南理工大学亚热带建筑与城市科学全国重点实验室,广东 广州 510640
  • 2. 华南理工大学土木与交通学院,广东 广州 510640
  • 3. 广东省建筑工程集团有限公司,广东 广州 510110
  • 折叠

摘要

Abstract

To ensure the construction safety of the complex spatial grid structure,the optimization analysis and monitoring of the construction process were carried out.An open single-layer spherical reticulated shell structure with a large rise-to-span ratio was taken as an example,and the construction process of this complex special-shaped structure was simulated through finite element analysis(FEA).By changing the boundary conditions of the support,the shape of the rib axis,and the support mode of the temporary support jig frame,different FEA models were established.The stress variations of key members and the structural displacement were analyzed to optimize the construction process.On this basis,the arc rod model with a temporary support jig frame was used as the final calculation model for construction process simulation,and the calculation results before and after unloading were compared with the on-site monitoring data to verify the accuracy of the FEA model in simulating the construction process.The failure sensitivity of the temporary support jig frame was further studied to avoid structural safety problems.The results show that the FEA model is consistent with the actual structure.The stress of each measuring point before and after unloading changes slightly,and the maximum tensile and compressive stress changes are 10.61 MPa and-5.67 MPa,respectively.The special-shaped spherical reticulated shell with a large rise-to-span ratio is in a controllable state during construction.The failure of a certain temporary support jig frame would have a great influence on member stress and structural displacement in the adjacent area.The maximum change of the member stress is 28.00 MPa,and that of the vertical displacement is 13 mm.Therefore,the reliability of the support jig frame shall be ensured during the construction.

关键词

网壳结构/施工过程/优化/监测/卸载

Key words

reticulated shell structure/construction process/optimization/monitoring/unloading

分类

建筑与水利

引用本文复制引用

石开荣,林志毅,姜正荣,陈春光,陈一乔,梁军..大矢跨比开口球壳的施工过程优化分析与监测[J].西南交通大学学报,2024,59(6):1440-1447,1486,9.