提高三峡工程发电效益的优化调度方式研究与展望

丁毅 邹强 饶光辉

中国水利Issue(22):48-54,7.
中国水利Issue(22):48-54,7.

提高三峡工程发电效益的优化调度方式研究与展望

Optimization of scheduling methodologies to improve power generation efficiency of the Three Gorges Project:research and prospect/

丁毅 1邹强 1饶光辉1

作者信息

  • 1. 长江勘测规划设计研究有限责任公司,430010,武汉
  • 折叠

摘要

Abstract

Being a national treasure,the Three Gorges Project generates enormous and comprehensive benefits for flood control,power generation,shipping and water resource utilization.It directly relates to water security,food security,ecological security and energy security of China,therefore project operation and scheduling management is crucial for benefit realization.Based on review,tasks and principles of scheduling for power generation are introduced.Optimization methods are evaluated,such as floating water level during flood season,scheduling of small and medium-sized floods,and early water storage at the end of flood season.Practical achievements of Three Gorges Project scheduling in recent years are summarized.Because power generated by the Three Gorges Project is huge,transmission and interconnection of its electricity to the national power grid is of great significance.With consideration of new requirements and conditions for joint scheduling of reservoirs in the Yangtze River Basin in the new era,analysis has been made on key issues need to be addressed.It proposes to take in-depth studies on dynamic control of operating water level of the Three Gorges Reservoir during the flood season,refine and optimize scheduling methods for small and medium-sized floods,alleviate competition on water between upstream reservoir group and the Three Gorges Reservoir at the end of the flood season,and improve power generation efficiency of hydropower stations,increase effective supply of water during the storage period and comprehensive benefits,in order to provide technical support for real-time scheduling and benefit generation of the project.

关键词

三峡工程/发电效益/汛期运行水位/中小洪水调度/汛末提前蓄水/调度成效

Key words

the Three Gorges Project/power generation efficiency/operation water level during flood season/small and medium-sized flood control/pre storage water at the end of the flood season/scheduling effectiveness

分类

建筑与水利

引用本文复制引用

丁毅,邹强,饶光辉..提高三峡工程发电效益的优化调度方式研究与展望[J].中国水利,2024,(22):48-54,7.

基金项目

国家重点研发计划资助项目(2021YFC3200302) (2021YFC3200302)

中国长江三峡集团有限公司科研项目(0799297) (0799297)

长江勘测规划设计研究有限责任公司自主创新项目(CX2019Z44). (CX2019Z44)

中国水利

1000-1123

访问量0
|
下载量0
段落导航相关论文