天津建设科技2024,Vol.34Issue(6):67-69,3.DOI:10.3969/j.issn.1008-3197.2024.06.017
汉江原水预处理工程设计优化及技术改造措施
Design Optimization and Technical Transformation Measures for Hanjiang Raw Water Pretreatment Project
张君芳1
作者信息
- 1. 湖北畅泉建设工程有限公司,湖北 孝感 432000
- 折叠
摘要
Abstract
The Han River raw water pretreatment project is an important component of the water supply in Xiaogan urban area.After years of operation and use,the evolution of the water intake channel and changes in the incoming water quality of the project have made it difficult for the original design sand discharge system to adapt to it.To ensure the safety and guarantee rate of urban water supply,this project proposes a series of design optimi-zation and technical transformation measures to address the problems that exist during the operation of the sand discharge system.After the implementation of the transformation,the sand discharge system operates sta-bly and can better cope with the impact of changes in cement sand load,meeting the design requirements.关键词
原水预处理/沉砂池/排泥阀/技术改造Key words
raw water pretreatment/grit chamber/mud valve/technical transformation分类
建筑与水利引用本文复制引用
张君芳..汉江原水预处理工程设计优化及技术改造措施[J].天津建设科技,2024,34(6):67-69,3.