解嘉豪 崔峰 韩刚 苌玉 刘虎 郝晓琦

西安科技大学学报2024,Vol.44Issue(6):1050-1059,10.
西安科技大学学报2024,Vol.44Issue(6):1050-1059,10.DOI:10.13800/j.cnki.xakjdxxb.2024.0604

深埋煤层临空面开采覆岩结构失稳机理与防治技术

Instability mechanism and prevention technology of overlying rock structure in the mining of deep-buried coal seam free face

解嘉豪 1崔峰 2韩刚 3苌玉 4刘虎 3郝晓琦3

作者信息

  • 1. 西安科技大学 能源学院,陕西 西安 710054||中煤能源研究院有限责任公司,陕西 西安 710054||中煤冲击地压与水害防治研究中心,内蒙古 鄂尔多斯 017200
  • 2. 西安科技大学 能源学院,陕西 西安 710054||西安科技大学 西部矿井开采及灾害防治教育部重点实验室,陕西 西安 710054
  • 3. 中煤能源研究院有限责任公司,陕西 西安 710054||中煤冲击地压与水害防治研究中心,内蒙古 鄂尔多斯 017200
  • 4. 西安科技大学 能源学院,陕西 西安 710054
  • 折叠

摘要

Abstract

In response to the problem of instability of the overlying rock structure and induced impact disasters during the free face mining process of deep buried coal seams,taking Shilawusu coal mine as the background,theoretical analysis and on-site monitoring methods were used to deeply analyze the e-volution law of the overlying rock structure above the working face and the mechanism of mining in-duced impact.The preventive measures of overlying rock burst on the working face were put forward and verified on site.The results show that the maximum breaking step distance of the main key layer in the 221-08 working face during the solid coal mining stage is 186.54 m,and the maximum breaking step distance of the main key layer during the open face mining is 337.79 m.The low-level key layer changes from O-X breaking to high-level key layer X-O breaking;During the solid coal mining stage on both sides of the 221-08 working face,the spatial structure of the overlying rock presents a long arm F-shaped structure.When the working face enters the goaf for mining,the overlying rock structure changes from a long arm"F"-shaped structure to a long arm T-shaped structure.Due to the maximum breaking step distance of the main key layer during mining on the working face,it will gradually bend and sink under its own gravity,releasing a large amount of bending elastic properties and inducing the mining seismic phenomenon.The implementation of the blasting and top cutting method for the main key layer effectively converts microseismic events from"high energy low frequency"to"low energy high frequency",effectively reducing the frequency of mining induced vibrations in the mine,ensuring safe production on site,and providing theoretical reference for such mines.

关键词

长臂F型/长臂T型/X-O结构/采空区/爆破卸压

Key words

long arm F shape/long arm T-shape/X-O structure/goaf/blasting pressure relief

分类

矿业与冶金

引用本文复制引用

解嘉豪,崔峰,韩刚,苌玉,刘虎,郝晓琦..深埋煤层临空面开采覆岩结构失稳机理与防治技术[J].西安科技大学学报,2024,44(6):1050-1059,10.

基金项目

国家自然科学基金项目(52422404) (52422404)

西安科技大学学报

OA北大核心CSTPCD

1672-9315

访问量4
|
下载量0
段落导航相关论文