| 注册
首页|期刊导航|云南水力发电|一种用于剪力墙施工中模板加固的施工方法

一种用于剪力墙施工中模板加固的施工方法

李欣然 李志国 朱玉 顾玉龙 朱仟胜

云南水力发电2024,Vol.40Issue(12):92-94,3.
云南水力发电2024,Vol.40Issue(12):92-94,3.DOI:10.3969/j.issn.1006-3951.2024.12.025

一种用于剪力墙施工中模板加固的施工方法

A Construction Method for Formwork Reinforcement in Shear Wall Construction

李欣然 1李志国 1朱玉 1顾玉龙 1朱仟胜1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

In the construction of reinforced concrete shear walls,quality defects such as honeycombing,pockmarks,and mold bursting are often unavoidable.Especially in rooms with high waterproofing requirements such as electrical rooms,concrete defects have a greater impact on waterproofing and other related performance.In order to enhance the reinforcement ability of the tension screw and improve the self waterproofing performance of the wall,the straight section length of the three-stage tension screw is increased,and a waterproof copper sheet is added to block the transmission path,thereby achieving the effect of improving the waterproof performance.At the same time,the three-stage structure can effectively enhance the ability to recycle the pull rod,achieving the effect of resource conservation.

关键词

三段式/可拆卸/防水效果/模板加固

Key words

three-stage approach/removable/waterproof effect/template reinforcement

分类

土木建筑

引用本文复制引用

李欣然,李志国,朱玉,顾玉龙,朱仟胜..一种用于剪力墙施工中模板加固的施工方法[J].云南水力发电,2024,40(12):92-94,3.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文