云南水力发电2024,Vol.40Issue(12):95-98,4.DOI:10.3969/j.issn.1006-3951.2024.12.026
复杂地层下穿河道顶管施工安全风险分析及控制措施
Safety Risk Analysis and Control Measures for Pipe Jacking Construction in Complex Strata Undercrossing River
杨华东 1王安兴 1王浩良1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
The relocation project of the cross river pipeline for the Shijing River and Xinshiyong River interception hub in Baiyun District,Guangzhou City,adopts practical and effective construction methods for pipe jacking in complex geological environments such as abundant and variable groundwater and quicksand in tidal river sections,hidden foundation treatment residues underground,and numerous surrounding above ground and underground buildings.In response to the complex geological conditions of this type,this paper analyzes the problems that exist during the construction process,mainly focusing on the analysis and solutions of the risks of pipe jacking in and out of the wellbore and pipe jacking construction,the risks of existing buildings(structures)crossing the river,and the risks of shallow soil cover pipe jacking.The impact on the safety of surrounding existing buildings and preventive measures are also discussed.关键词
地下/复杂地质/顶管施工/沉井/安全Key words
underground/complex geology/top pipe construction/sinking well/security分类
水利科学引用本文复制引用
杨华东,王安兴,王浩良..复杂地层下穿河道顶管施工安全风险分析及控制措施[J].云南水力发电,2024,40(12):95-98,4.