铁道货运2024,Vol.42Issue(12):27-34,42,9.DOI:10.16669/j.cnki.issn.1004-2024.2024.12.04
晋鲁地区铁路重去重回循环班列设计研究
Circular Railway Train Design of Full-Load Shuttle Traffic between Shanxi and Shandong Regions
摘要
Abstract
The perfect structure of the railway network between Shanxi and Shandong regions,the frequent exchange of goods,and the large volume of exchanges,have laid a good foundation for building full-loaded shuttle traffic in the circular logistics system.By sorting out the transportation demand of key railway clients such as coastal ports in Shandong Province,iron and steel enterprises,and coal mining enterprises in Shanxi Province radiated by ports in Shandong region,this paper analyzed the allocation of railway capacity resources between Shanxi and Shandong regions.Then,based on the product model of circular trains of full-load shuttle traffic and the transportation demand between each station,the total revenue of product operation was taken as the optimization goal and constrained by specific conditions such as railway section and station capacity.The operation plan model of circular railway trains of full-load shuttle traffic was constructed.Based on the actual freight transportation network of the railway,the practical and feasible product scheme of circular trains of full-load shuttle traffic between Shanxi and Shandong regions was obtained.关键词
铁路运输/运输需求/重去重回/循环班列/产品设计Key words
Railway Transportation/Transportation Demand/Full-Load Shuttle Traffic/Circular Train/Product Design分类
交通工程引用本文复制引用
游艳雯,权诗琦,倪继娜,张楷唯..晋鲁地区铁路重去重回循环班列设计研究[J].铁道货运,2024,42(12):27-34,42,9.基金项目
中国国家铁路集团有限公司科技研究开发计划课题(K2023X033,J2023X007) (K2023X033,J2023X007)