铁道货运2024,Vol.42Issue(12):43-50,57,9.DOI:10.16669/j.cnki.issn.1004-2024.2024.12.06
中哈第三铁路通道巴克图口岸站方案研究
Scheme for Baketu Port Station on Third Railway Corridor between China and Kazakhstan
摘要
Abstract
The Baketu Port Station is a crucial hub on the China-Kazakhstan Border Railway.The establishment of the station requires a comprehensive consideration of various influencing factors.Based on the Tacheng-Ayagoz Railway Project of the China-Kazakhstan Railway,this paper took into account the access conditions of the ongoing and reserved branch railways in the Tacheng region.It also analyzed the overall urban planning of Tacheng and studied the site selection and layout of the Baketu Port Station.Through the analysis of station engineering conditions,adaptability to urban industrial park planning,and freight flow organizational conditions,a comprehensive comparison of site selection schemes for the Baketu Port Station was conducted.According to the practical planning and development situation of the Tacheng Development and Opening-up Experimental Zone,it was recommended to choose the site on the south side of the experimental zone for the Baketu Port Station.Following the principles of engineering feasibility and safe and efficient operation,the paper comprehensively compared horizontal,tandem hybrid,and horizontal hybrid station layouts and recommended adopting a tandem hybrid layout for the new Baketu Port Station.关键词
巴克图口岸/口岸站/车站布置/方案比选/边境铁路Key words
Baketu Port/Port Station/Station Layout/Scheme Comparison/Border Railway分类
交通工程引用本文复制引用
郝红刚..中哈第三铁路通道巴克图口岸站方案研究[J].铁道货运,2024,42(12):43-50,57,9.基金项目
新疆铁道勘察设计院有限公司科研项目(XJTSR-2023-030) (XJTSR-2023-030)