云南水力发电2024,Vol.40Issue(12):134-136,3.DOI:10.3969/j.issn.1006-3951.2024.12.037
水库工程施工质量控制与隐患管理
Quality Control and Hidden Danger Management of Reservoir Engineering Construction
陈沛然1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
Luotian Reservoir Project is an important transfer node for water resource allocation in the Pearl River Delta region.It plays a crucial role in providing drinking water and industrial production water,while also serving as a reservoir for flood control.With the rapid development of urban socio-economic construction in the downstream area of the reservoir,dam failures will cause huge losses to the downstream,and flood control standards should be correspondingly raised.The construction of reservoir upgrading and renovation throughout the entire process is a very important issue.Quality control throughout the entire construction process of reservoir engineering can effectively solve problems and hidden dangers in various construction stages,which is of great significance for the upgrading,renovation,and subsequent operation of reservoirs.关键词
水库/工程施工/质量控制/隐患管理Key words
reservoir/engineering construction/quality control/hazard management分类
建筑与水利引用本文复制引用
陈沛然..水库工程施工质量控制与隐患管理[J].云南水力发电,2024,40(12):134-136,3.