盾构TBM施工管理

贾鹏飞 陈沛然 梁飞

云南水力发电2024,Vol.40Issue(12):148-151,4.
云南水力发电2024,Vol.40Issue(12):148-151,4.DOI:10.3969/j.issn.1006-3951.2024.12.041

盾构TBM施工管理

Construction Management of Shield TBM

贾鹏飞 1陈沛然 1梁飞1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The shield tunneling method has been widely used due to its obvious advantages,mainly manifested in safe excavation and lining.Excavation and lining operations are carried out under the cover of shield tunneling,ensuring sufficient construction safety.Underground construction does not affect surface transportation,and underwater construction does not affect river navigation.It is suitable for construction at large depths and with high groundwater pressure,and relatively low construction costs.Its construction operation is not affected by climatic conditions,and the environmental hazards such as vibration and noise generated are relatively small,with minimal impact on ground buildings and underground pipelines.Shield tunneling construction has a high degree of mechanization,fast progress,and can significantly shorten the construction period.

关键词

盾构/机械化施工/优越性/安全/进度快

Key words

shield tunneling/mechanized construction/superiority/safety/fast progress

分类

建筑与水利

引用本文复制引用

贾鹏飞,陈沛然,梁飞..盾构TBM施工管理[J].云南水力发电,2024,40(12):148-151,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文