云南水力发电2024,Vol.40Issue(12):148-151,4.DOI:10.3969/j.issn.1006-3951.2024.12.041
盾构TBM施工管理
Construction Management of Shield TBM
贾鹏飞 1陈沛然 1梁飞1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
The shield tunneling method has been widely used due to its obvious advantages,mainly manifested in safe excavation and lining.Excavation and lining operations are carried out under the cover of shield tunneling,ensuring sufficient construction safety.Underground construction does not affect surface transportation,and underwater construction does not affect river navigation.It is suitable for construction at large depths and with high groundwater pressure,and relatively low construction costs.Its construction operation is not affected by climatic conditions,and the environmental hazards such as vibration and noise generated are relatively small,with minimal impact on ground buildings and underground pipelines.Shield tunneling construction has a high degree of mechanization,fast progress,and can significantly shorten the construction period.关键词
盾构/机械化施工/优越性/安全/进度快Key words
shield tunneling/mechanized construction/superiority/safety/fast progress分类
建筑与水利引用本文复制引用
贾鹏飞,陈沛然,梁飞..盾构TBM施工管理[J].云南水力发电,2024,40(12):148-151,4.