The current drainage capacity of Xinlianwei is weak and does not meet the requirements of flood control and drainage.A new Xutao electric drainage station has been built in response to the existing through embankment buildings and embankments.The pump station adopts a post embankment layout,and the left bank of the water storage tank adopts a gabion cage retaining wall.The foundation treatment adopts a prestressed pipe pile foundation treatment scheme,and the stability and anti floating review of the foundation is carried out.A construction plan for the pump station has been proposed.关键词
泵站/防洪排涝/地基基础/稳定分析Key words
pump station/flood control and drainage/ground foundation/stability analysis分类