云南水力发电2024,Vol.40Issue(12):21-23,3.DOI:10.3969/j.issn.1006-3951.2024.12.007
基于Mike模型的蓄滞洪区风电项目洪水影响分析
Flood Impact Analysis of Wind Power Projects in Flood Storage and Detention Areas Based on Mike Model
摘要
Abstract
Wind power generation,as a supplement to conventional energy sources,holds significant importance in terms of environmental protection and energy strategy.Taking the wind power project in the flood storage and detention area as an example,grid subdivision is carried out based on the measured topographic map of the middle and lower reaches of Daqing River.A model is established using Mike 21 software to generalize the water blocking area of the construction project,simulate the flood discharge impact on the flood storage and detention area before and after the project construction,and provide reliable data for flood control dispatch.At the same time,measures are proposed to eliminate or mitigate the potential impact of floods on wind power projects.关键词
Mike21模型/蓄滞洪区/风电/洪水影响Key words
Mike 21 model/flood storage and detention area/wind power/flood impact分类
建筑与水利引用本文复制引用
吴昊潼,刘思妤,杨赫,张文娜..基于Mike模型的蓄滞洪区风电项目洪水影响分析[J].云南水力发电,2024,40(12):21-23,3.基金项目
"十四五"国家重点研发计划资助项目(YFC2021YFC3200204) (YFC2021YFC3200204)