Abstract
Hongshiyan Dam is a comprehensive water conservancy hub project formed after emergency response and remediation of the"8.03"earthquake disaster in Ludian,Yunnan.By monitoring the seepage pressure inside the anti-seepage wall,seepage around the dam,and seepage flow behind the dam of Hongshiyan Dam,it is shown that the anti-seepage system is operating normally without any abnormal seepage changes,and the overall anti-seepage effect of the dam is good.At the same time,it can provide relevant experience for the design of subsequent dam seepage monitoring.关键词
堰塞坝/防渗系统/渗流监测/成果分析Key words
landslide dam/anti-seepage system/seepage monitoring/achievement analysis分类
建筑与水利引用本文复制引用
黄张霖,冯燕明,施俊稳..红石岩堰塞坝运行初期防渗系统监测成果分析[J].云南水力发电,2024,40(12):32-36,5.基金项目
中国电建集团科技项目(DJ-ZDXM-2019-45) (DJ-ZDXM-2019-45)