红石岩堰塞坝运行初期防渗系统监测成果分析

黄张霖 冯燕明 施俊稳

云南水力发电2024,Vol.40Issue(12):32-36,5.
云南水力发电2024,Vol.40Issue(12):32-36,5.DOI:10.3969/j.issn.1006-3951.2024.12.010

红石岩堰塞坝运行初期防渗系统监测成果分析

Analysis of Monitoring Results of Anti seepage System in the Initial Operation of Hongshiyan Dam

黄张霖 1冯燕明 1施俊稳1

作者信息

  • 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051||云南省水利水电工程安全重点实验室,云南 昆明 650051
  • 折叠

摘要

Abstract

Hongshiyan Dam is a comprehensive water conservancy hub project formed after emergency response and remediation of the"8.03"earthquake disaster in Ludian,Yunnan.By monitoring the seepage pressure inside the anti-seepage wall,seepage around the dam,and seepage flow behind the dam of Hongshiyan Dam,it is shown that the anti-seepage system is operating normally without any abnormal seepage changes,and the overall anti-seepage effect of the dam is good.At the same time,it can provide relevant experience for the design of subsequent dam seepage monitoring.

关键词

堰塞坝/防渗系统/渗流监测/成果分析

Key words

landslide dam/anti-seepage system/seepage monitoring/achievement analysis