云南水力发电2024,Vol.40Issue(12):44-46,59,4.DOI:10.3969/j.issn.1006-3951.2024.12.013
阶梯式生态框挡墙在神仙岭排洪渠治理工程中的应用
Application of Stepped Ecological Frame Retaining Wall in the Flood Control Project of Shenxianling Drainage Channel
余国爱 1杨光武1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
This paper introduces the application of stepped ecological frame retaining walls in the flood control project of Shenxianling,as well as the tracking and feedback of project implementation and completion effects.It explains that the stepped ecological frame retaining wall not only has the traditional functions of retaining soil,slope protection,and drainage in the comprehensive management of small and medium-sized rivers,but also has the functions of protecting the river ecology and increasing the river landscape effect,which meets the requirements of relevant national ecological civilization construction.关键词
阶梯式生态框/综合治理/生态/河道景观效果Key words
ladder style ecological framework/comprehensive governance/ecology/river landscape effect分类
建筑与水利引用本文复制引用
余国爱,杨光武..阶梯式生态框挡墙在神仙岭排洪渠治理工程中的应用[J].云南水力发电,2024,40(12):44-46,59,4.