云南水力发电2024,Vol.40Issue(12):70-73,4.DOI:10.3969/j.issn.1006-3951.2024.12.019
岩溶、裂隙发育区地表超前固结灌浆施工技术
Construction Technology of Surface Advanced Consolidation Grouting in Karst and Fissure Development Area
余江 1张彦风 1杨健光 1王刚1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
Consolidation grouting is a common construction method in hydraulic engineering construction.Consolidation grouting can effectively improve the development of rock joints and fractures or rock fragmentation,enhance the physical and mechanical properties,as well as the overall integrity and homogeneity of rocks.At the same time,it increases the elastic modulus and compressive strength of the rock mass,reduces deformation and uneven settlement of the rock mass,and improves construction safety.Taking the surface advanced consolidation grouting of a karst area in a water conservancy project in Shenzhen as the research object,this paper summarizes the problems and treatment measures encountered in the construction process of consolidation grouting in karst and fissure development areas,and studies the construction technology and measures of consolidation grouting in karst development areas.关键词
岩溶区/地表超前固结灌浆/工艺优化,控制要点Key words
karst area/advanced consolidation grouting on the surface/process optimization,key control point分类
建筑与水利引用本文复制引用
余江,张彦风,杨健光,王刚..岩溶、裂隙发育区地表超前固结灌浆施工技术[J].云南水力发电,2024,40(12):70-73,4.