云南水力发电2024,Vol.40Issue(12):74-77,4.DOI:10.3969/j.issn.1006-3951.2024.12.020
松木山水库隧道盾构机泥水处理系统的设计及施工
Design and Construction of Mud and Water Treatment System for Shield Machine in Songmushan Reservoir Tunnel
张发迪 1朱律1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
The slurry balance shield machine is more suitable for tunnel construction crossing rivers and lakes due to its ability to maintain pressure on the excavation surface and form a mud film.The formation of mud film is mainly achieved by the mud provided by the mud water treatment system.Therefore,the mud water treatment system is the most important system of the mud water balance shield machine.It mainly includes the following subsystems:mud water separation system,pressure filtration system,slurry mixing system,pulp preparation system,and centralized control system.By combining manufacturer parameters for the design of supporting facilities,various subsystems from different manufacturers are integrated into a complete large system,and remote control and real-time monitoring are achieved through a monitoring system.关键词
泥水平衡盾构/临建设施/泥水分离/压滤/调浆/制浆Key words
mud water balance shield tunneling/temporary construction facility/mud water separation/pressure filtration/slurry adjustment/pulping分类
建筑与水利引用本文复制引用
张发迪,朱律..松木山水库隧道盾构机泥水处理系统的设计及施工[J].云南水力发电,2024,40(12):74-77,4.