| 注册
首页|期刊导航|长江科学院院报|基于预报预泄的五强溪水库主汛期运行水位优化

基于预报预泄的五强溪水库主汛期运行水位优化

沙永兵 巴欢欢 王也 肖杨 傅巧萍 李肖男

长江科学院院报2024,Vol.41Issue(12):23-28,39,7.
长江科学院院报2024,Vol.41Issue(12):23-28,39,7.DOI:10.11988/ckyyb.20240724

基于预报预泄的五强溪水库主汛期运行水位优化

Optimization of Operating Water Level of Wuqiangxi Reservoir in Main Flood Season Based on Forecast and Pre-discharge

沙永兵 1巴欢欢 2王也 1肖杨 1傅巧萍 2李肖男2

作者信息

  • 1. 五凌电力有限公司,长沙 410004
  • 2. 长江设计集团有限公司,武汉 430010||长江勘测规划设计研究有限责任公司流域水安全保障湖北省重点实验室,武汉 430010
  • 折叠

摘要

Abstract

Optimizing the dispatching mode during flood season is a crucial step in enhancing the comprehensive benefits of Wuqiangxi Reservoir.On the premise of ensuring flood control safety,we employed the method of fore-cast and pre-discharge to investigate the range and starting conditions for dynamic control of water level,and the operation mode of pre-discharge for Wuqiangxi Reservoir during the main flood season.Additionally,we calculated the comprehensive benefits of uplifting operational water level in flood season.Case studies on the flood season oper-ations in 1996 and 2019 demonstrate that dynamic control of operating water level during flood season increased power generation head by 0.48 and 0.54 meters,reduced wasted water by 853 million and 956 million cubic me-ters,and boosted power generation by 126 million and 134 million kW·h,respectively.The results indicate that under controllable risk conditions,dynamic control of operating water level in Wuqiangxi Reservoir during flood season significantly improves power generation efficiency while reducing the likelihood of unit output blockage and water waste.

关键词

运行水位优化/动态控制/预报预泄/主汛期/五强溪水库

Key words

water level optimization/dynamic control/forecast and pre-discharge/main flood season/Wuqiangxi reservoir

分类

建筑与水利

引用本文复制引用

沙永兵,巴欢欢,王也,肖杨,傅巧萍,李肖男..基于预报预泄的五强溪水库主汛期运行水位优化[J].长江科学院院报,2024,41(12):23-28,39,7.

基金项目

国家重点研发计划项目(2021YFC3200302) (2021YFC3200302)

湖北省/武汉市科技计划项目(2021WHYCQN-04) (2021WHYCQN-04)

长江科学院院报

OA北大核心CSTPCD

1001-5485

访问量9
|
下载量0
段落导航相关论文