适应大型燃煤机组全工况灵活性运行的快速变负荷控制策略OA北大核心CSTPCD
A rapid load varying control strategy for flexible operation of large scale coal-fired power unit under full operating conditions
随着高比例可再生能源电网负荷波动问题的日益突出,提高大型燃煤机组在全工况下的快速变负荷能力已成为维护电力系统安全稳定运行的迫切需求.为此,提出了一种与高加旁路改造技术相结合的负荷快速调控策略以实现灵活性需求下的超临界机组全工况负荷快速爬坡.首先,为机组的高压回热系统增加一条高加小旁路灵活改变从汽轮机抽取的高温高压蒸汽量,以加快直流锅炉的能量供给速率;其次,充分考虑滑压运行模式下机炉可承受的主蒸汽压力、温度的上下限及变化速率,同时对输出功率与主蒸汽压力进行解耦并设计一套适应机组高爬坡速率的负荷快速调控方案;最后,在某燃煤 600 MW机组上进行试验验证.研究结果表明,负荷爬坡速率 3%Pe/min 下机组能够实现全工况范围内的负荷快速响应,且主蒸汽压力、汽轮机总调节阀开度等参数保持平稳变化,并通过仿真验证了机组在负荷爬坡速率 5%Pe/min 下的负荷调节能力,充分证实了所设计负荷快速调控策略的有效性.
With the increasingly prominent problem of load fluctuations in high proportion renewable energy grids,improving the fast load response ability of large-scaled thermal power units under full operating conditions has become an urgent need to maintain the safe and stable operation of the power system.Therefore,a rapid load change strategy combined with the high-pressure bypass transformation technology under the flexibility demand of supercritical power units is proposed.Firstly,the high-pressure bypass is added to the high-pressure regenerative system to flexibly change the steam extracted amount from turbine,thus to accelerate the energy supply rate of once-through boiler.Secondly,to adapt to the high ramping rate,a load change scheme is designed with the limitations of main steam pressure,temperature and their change rate that boiler can withstand at sliding-pressure operation mode and the decoupling of load-main steam pressure for unit.Finally,test on a 600 MW coal-fired thermal power unit shows that,the unit can successfully achieve a high load ramping rate of 3%Pe/min under full operating conditions.Moreover,the main steam pressure,position of main steam valve and other parameters are maintained stable.In addition,the load regulation ability of the unit with load ramping rate of 5%Pe/min is verified,confirming the effectiveness of the proposed load rapid regulation strategy.
侯国莲;黄婷;郭志强;余琦;江浩;李勇;周振华;安振一
华北电力大学控制与计算机工程学院,北京 102206西安热工研究院有限公司,陕西 西安 710054国电电力大连庄河发电有限责任公司,辽宁 大连 116431
燃煤机组负荷快速爬坡全工况灵活运行改进协调控制策略
coal-fired unitshigh load ramping ratefull load conditionflexible operationimproved coordinated control strategy
《热力发电》 2024 (012)
93-101 / 9
国家重点研发计划项目(2019YFB1505400)National Key Research and Development Program(2019YFB1505400)