| 注册
首页|期刊导航|设备监理|岸桥拖链电缆安装技术研究

岸桥拖链电缆安装技术研究

龙浩

设备监理Issue(6):55-58,4.
设备监理Issue(6):55-58,4.DOI:10.19919/j.issn.2095-2465.2024.12.012

岸桥拖链电缆安装技术研究

Research on Installation Technology of Drag Chain Cable for Shore Crane

龙浩1

作者信息

  • 1. 上海振华重工(集团)股份有限公司长兴分公司 上海 201913
  • 折叠

摘要

Abstract

The installation process of drag chain cables for shore container cranes is relatively complicated,which makes it difficult to achieve the expected installation effect.In order to avoid cable damage and eliminate installation hazards,a research on the installation technology of drag chain cables for shore crane is proposed.The article briefly describes the principle of the power supply system for drag chain cables,discussing the installation technology of drag chain cables in the partial assembly stage and the installation technology of drag chain cables after final assembly.It explains and analyzes the installation precautions,simplifies the installation difficulty,and provides reference for the installation technology of crane drag chain cables.

关键词

岸桥/拖链电缆/电缆安装/电缆固定

Key words

Shore crane/Drag chain cable/Cable installation/Cable fixation

分类

通用工业技术

引用本文复制引用

龙浩..岸桥拖链电缆安装技术研究[J].设备监理,2024,(6):55-58,4.

设备监理

2095-2465

访问量0
|
下载量0
段落导航相关论文