摘要

Abstract

The impoundment-affected area of hydropower engineering comprises landslide,deformed reservoir bank,bank collapse,submergence,karst inundation,and mining subsidence deformation impact areas.Related standards have specified the principles and the contents for identifying impoundment-affected area,but in view of the complexity of geological conditions and the diversity of affected objects,some knowledge yet to be unified.Based on the practical experiences of many large-scale hydropower stations,this paper focuses on the key points for identifying such impoundment-affected areas as landslides,deformed reservoir bank,bank collapse and submergence impact area,and combines some engineering examples to elaborate on the determination of two special types of impoundment-affected area,that is reservoir inundation impact area and reservoir debris flow impact.

关键词

水电工程/水库区地质勘察/水库影响区判别/水库内涝影响区/水库泥石流影响

Key words

hydropower engineering/reservoir area engineering geological investigation/identification of impoundment-affected area/reservoir inundation impact area/reservoir debris flow impact

分类

水利科学

引用本文复制引用

何万通,张东升,郭德存,张伟恒..高坝大库水库影响区判别要点与特殊水库影响型式探讨[J].水力发电,2025,51(1):43-50,8.

基金项目

中国电力建设股份有限公司科技项目(DJ-ZDXM-2019-03) (DJ-ZDXM-2019-03)

水电水利规划设计总院科技项目(ZY-KJSD-20240007) (ZY-KJSD-20240007)

水力发电

0559-9342

访问量0
|
下载量0
段落导航相关论文