| 注册
首页|期刊导航|铁道科学与工程学报|盾构隧道水泥-水玻璃双液同步注浆研究及应用

盾构隧道水泥-水玻璃双液同步注浆研究及应用

陈鹏 王先明 周安琦 刘四进 王建华 肖明清 王士民

铁道科学与工程学报2024,Vol.21Issue(12):5163-5174,12.
铁道科学与工程学报2024,Vol.21Issue(12):5163-5174,12.DOI:10.19713/j.cnki.43-1423/u.T20240373

盾构隧道水泥-水玻璃双液同步注浆研究及应用

Research and application of cement-sodium silicate two-component synchronous grouting material in shield tunnel

陈鹏 1王先明 2周安琦 2刘四进 1王建华 1肖明清 3王士民2

作者信息

  • 1. 中铁十四局集团大盾构工程有限公司,江苏 南京 211800
  • 2. 西南交通大学 交通隧道工程教育部重点实验室,四川 成都 610031
  • 3. 中铁第四勘察设计院集团有限公司,湖北 武汉 430063
  • 折叠

摘要

Abstract

At present,the application of cement-sodium silicate(C-S)two-component grouting materials in the field of synchronous grouting is increasing.However,in actual projects,especially in large-diameter shield tunnels,the problems of material performance regulation,pipe clogging,and tail sealing with dual slurry,holding the shield tail of C-S grout,and the corresponding control measures are seldom mentioned.By taking Beijing East Sixth Ring Road super-diameter shield tunnel project as the project background,this paper investigated the role of the base material and its influence on the physical and mechanical properties of C-S grout through orthogonal tests,and put forward a kind of C-S grouting ratio for shield tunnel in water-rich sand layer.Further,the fluidity,gelation characteristics and compressive strength of C-S grout injected from the pipeline were verified by the adaptability test,and the construction control measures and application effect of C-S synchronous grouting in actual projects were summarized based on engineering practice.The results show that:1)In C-S grout,the early gelation time is mainly affected by sodium silicate,the 28-day strength is mainly affected by cement,and the dosage of both is the most important factor in controlling the mechanical properties of C-S grout.2)Due to the fast-setting characteristics,the grouting fraction of C-S grout should be set to avoid grout in the shield tail gap to overcome gravity upward extrusion.Pipeline cleaning should be carried out after the completion of the synchronous grouting of each segment ring,bentonite grout should be used to replace C-S grout for shield tail blocking when the shield machine is shut down for a long period of time.3)In the application of the actual project,C-S grout can fix segment in about 4 h,so that the vertical deformation of the segment ring is between-10 mm and 10 mm.The ground settlement can also be stably controlled at-4.3 mm to 3.3 mm in about 280 h,which comprehensively improves the quality of the tunnel.The conclusions of the study provide a reference for the application and optimization of C-S grout in the field of synchronous grouting in shield tunnels.

关键词

同步注浆/水泥-水玻璃双液浆/正交试验/施工控制/应用效果

Key words

simultaneous grouting/cement-sodium silicate grouting/orthogonal test/construction control/application effects

分类

交通工程

引用本文复制引用

陈鹏,王先明,周安琦,刘四进,王建华,肖明清,王士民..盾构隧道水泥-水玻璃双液同步注浆研究及应用[J].铁道科学与工程学报,2024,21(12):5163-5174,12.

基金项目

国家自然科学基金资助项目(52178398) (52178398)

铁道科学与工程学报

OA北大核心CSTPCDEI

1672-7029

访问量12
|
下载量0
段落导航相关论文