人工海岛建设技术现状与同步建造新思路

张明 陈湘生 陈长卿 周进威 陈佛赐 李强 关军 苏栋

深圳大学学报(理工版)2025,Vol.42Issue(1):19-29,11.
深圳大学学报(理工版)2025,Vol.42Issue(1):19-29,11.DOI:10.3724/SP.J.1249.2025.01019

人工海岛建设技术现状与同步建造新思路

Review of artificial island construction technology and innovative approaches to synchronous construction

张明 1陈湘生 2陈长卿 3周进威 2陈佛赐 3李强 2关军 4苏栋2

作者信息

  • 1. 中国建筑工程(香港)有限公司,中国香港 999077||中国建筑国际集团有限公司,中国香港 999077
  • 2. 深圳大学土木与交通工程学院,广东 深圳 518060
  • 3. 中国建筑工程(香港)有限公司,中国香港 999077||中国建筑国际集团有限公司,中国香港 999077||中国建筑土木工程有限公司,中国香港 999077
  • 4. 中国建筑国际集团有限公司,中国香港 999077||中海建筑有限公司,广东 深圳 518057
  • 折叠

摘要

Abstract

With the continuous growth of urban development,ocean resource exploitation and tourism demands,the construction of artificial islands has become increasingly important.Traditional methods for constructiing artificial islands mainly include non-cofferdam reclamation and cofferdam-based wet reclamation.However,these methods have several problems:the ground treatment lacks systematic reinforcement measures,which can easily lead to significant settlement;the construction process of backfill materials is prone to disturbing the marine environment,affecting water quality and the ecosystem;and there are repetitive excavation procedures in subsequent engineering construction,increasing the workload and costs.To address these issues,a synchronous construction method,namely dry reclamation with cofferdam,is proposed for building artificial-island cities.The specific procedures of this method are as follows:cofferdams are constructed facing each other on the outer sides of the designated area,while offshore cement-soil mixing piles are used to reinforce the ground in the filling area;after the cofferdam is completed,seawater is pumped out and a cushion layer is evenly laid on the original seabed;building pile foundation are then constructed,followed by the installation of prefabricated underground structures such as tunnels,pipe galleries,and basements at the bottom elevation.Simultaneously,soil backfilling is carried out layer by layer.This process is repeated structural construction and soil backfilling until the backfill reaches the specified elevation.The synchronous construction method can reduce the amount of filling material and the cost of re-excavation,which can greatly shorten the construction period and lower overall costs,and reduce environmental pollution during the reclamation process.The research results can provide a new option and reference for construction of large-scale artificial islands.

关键词

岩土工程/人工海岛/同步建造/围堰结构/地基加固/装配式结构

Key words

geotechnical engineering/artificial island/simultaneous construction/cofferdam structure/foundation reinforcement/prefabricated structure

分类

土木建筑

引用本文复制引用

张明,陈湘生,陈长卿,周进威,陈佛赐,李强,关军,苏栋..人工海岛建设技术现状与同步建造新思路[J].深圳大学学报(理工版),2025,42(1):19-29,11.

基金项目

National Natural Science Foundation of China(52090084) (52090084)

Shenzhen Science and Technology Program(20220808143139001) (20220808143139001)

Shenzhen University 2035 Research Excellence Program(2022B007) 国家自然科学基金资助项目(52090084) (2022B007)

深圳市科技计划资助项目(20220808143139001) (20220808143139001)

深圳大学2035追求卓越研究计划资助项目(2022B007) (2022B007)