| 注册
首页|期刊导航|广东水利水电|几种常用分期设计洪水计算方法及适用性分析

几种常用分期设计洪水计算方法及适用性分析

谢天云 吴春熠 韦露斯

广东水利水电Issue(1):24-30,46,8.
广东水利水电Issue(1):24-30,46,8.

几种常用分期设计洪水计算方法及适用性分析

Several Commonly Used Staged Design Flood Calculation Methods and Their Applicability Analysis

谢天云 1吴春熠 2韦露斯1

作者信息

  • 1. 珠江水文水资源勘测中心,广州 510630
  • 2. 水利部珠江水利委员会水文局,广州 510630
  • 折叠

摘要

Abstract

In order to improve the quality of calculation and analysis results of phased design flood,so as to better carry out engineering planning and design,construction organization,scheduling optimization,this paper classifies the calculation methods of phased design flood,and takes Hainan Province,Guangdong Province as an example,several common calculation methods based on measured discharge frequency calculation method,hydrologic analogy method,Guangdong flood peak experience method,comprehensive unit line method,reasoning formula method are sorted out,and the applicability,common errors and unreasonable limitations of each method are analyzed and discussed.It can provide reference for water conservancy practitioners to avoid repeating mistakes,and also provide beneficial exploration for standardized and scientific calculation of phased design flood.

关键词

分期设计洪水/计算方法/适用性/局限性

Key words

staged design flood/calculation methods/applicability/limitation

分类

建筑与水利

引用本文复制引用

谢天云,吴春熠,韦露斯..几种常用分期设计洪水计算方法及适用性分析[J].广东水利水电,2025,(1):24-30,46,8.

广东水利水电

1008-0112

访问量0
|
下载量0
段落导航相关论文