广东水利水电Issue(1):58-62,5.
东莞大堤局部堤段地质隐患形成机理及除险加固方案分析
Study on Formation Mechanism of Potential Hazards and Reinforcement Engineering of Dongguan Embankment
樊姝芳 1刁育忠 2侯文哲3
作者信息
- 1. 东莞市水务技术中心,广东 东莞 523000
- 2. 东莞市大堤管理处,广东 东莞 523000
- 3. 广东开放大学 工程技术学院,广州 510000
- 折叠
摘要
Abstract
Based on geological investigation and ground penetrating radar were conducted to detect the secondary platform along the Guancheng section of the Dongguan embankment,which identified 77 anomaly points within the dam,with depths ranging from 0.5 to 5.5 m.Data processing and image interpretation helped pinpoint potential hazards,then the location and type of the hazard were determined.The formation mechanism of the settlement was comprehensively analyzed by combining the results of indoor and outdoor tests and the reinforcement scheme of high-pressure rotary jet pile is proposed.关键词
堤防/地质雷达/沉降/隐患/加固Key words
embankment/ground penetrating radar/settlement/potential hazard/reinforcement分类
建筑与水利引用本文复制引用
樊姝芳,刁育忠,侯文哲..东莞大堤局部堤段地质隐患形成机理及除险加固方案分析[J].广东水利水电,2025,(1):58-62,5.