水系连通工程对近海潮汐水域水动力的影响

王逸飞 王艳红 杨啸宇 缴健 丁磊

人民珠江2025,Vol.46Issue(1):78-87,10.
人民珠江2025,Vol.46Issue(1):78-87,10.DOI:10.3969/j.issn.1001-9235.2025.01.009

水系连通工程对近海潮汐水域水动力的影响

Influence of Water System Connectivity Project on Hydrodynamics of Offshore Tidal Waters

王逸飞 1王艳红 2杨啸宇 2缴健 2丁磊2

作者信息

  • 1. 南京水利科学研究院 港口航道泥沙工程交通行业重点实验室,江苏 南京 210029||四川大学 山区河流保护与治理全国重点实验室,四川 成都 610065
  • 2. 南京水利科学研究院 港口航道泥沙工程交通行业重点实验室,江苏 南京 210029
  • 折叠

摘要

Abstract

Tidal waters refer to rivers,lakes,and other water bodies with periodic water level and velocity changes in coastal areas affected by offshore tides.The water system connectivity project adopts a series of artificial or natural measures to connect the water system and realize the hydraulic connection between the rivers.In this study,a two-dimensional hydrodynamic mathematical model was used to simulate the hydrodynamic conditions in the Longjiang Pond before and after the construction of the Longjiang River System Connectivity Project.The results show that the water flow velocity in most areas before and after the construction of the project is smaller than 2 cm/s,and the water flow velocity in some areas with poor water exchange capacity is smaller than 0.5 cm/s.The hydrodynamic conditions in the north lake area are obviously weaker than those in the south lake area,and the hydrodynamic conditions in the dry season and the rainy season are not much different.The net water flux before and after the construction of the project is basically similar,but the total amount of water exchange after the construction of the project is much larger than that before the construction of the project.During the flood tide,the flow velocity in the lake area and the connection section after the construction of the project is significantly reduced,while the flow velocity in the lake area and the connection section after the construction of the project is significantly increased during the ebb tide.Since the project itself has no additional power,the project only significantly improves the water dynamics in the waters near the two connected engineering channels.Therefore,it is recommended to add pumping stations in the connected channels of the two water systems or add water replenishment points in some areas with poor improvement effects to increase local water mobility.

关键词

潮汐水域/水系连通/二维水动力数学模型/水动力/水体净通量/水体交换总量

Key words

tidal waters/water system connectivity/two-dimensional hydrodynamic mathematical model/hydrodynamic/net water flux/total water exchange

分类

建筑与水利

引用本文复制引用

王逸飞,王艳红,杨啸宇,缴健,丁磊..水系连通工程对近海潮汐水域水动力的影响[J].人民珠江,2025,46(1):78-87,10.