| 注册
首页|期刊导航|电力勘测设计|浅析电力工程企业通过战略破局冲出发展"天花板"

浅析电力工程企业通过战略破局冲出发展"天花板"

丁鹏 庞可

电力勘测设计Issue(1):1-5,5.
电力勘测设计Issue(1):1-5,5.DOI:10.13500/j.dlkcsj.issn1671-9913.2025.01.001

浅析电力工程企业通过战略破局冲出发展"天花板"

A Brief Analysis on Electric Engineering Enterprise Breaking through Development"Ceiling"by Strategy Implementation

丁鹏 1庞可1

作者信息

  • 1. 中国电力建设集团有限公司,北京 100037
  • 折叠

摘要

Abstract

Electric Engineering enterprises that focus on traditional design or construction as their main business need to undergo continuous changes and systematic iterative upgrades in the process of transition.In the process of constantly adjusting and striving to break through,some companies have found that problems are continuously being exposed and accumulated.Enterprise development seems to be trapped by an invisible"ceiling",which makes it difficult to achieve upward breakthroughs.Via case analysis,this article explores how to achieve breakthrough development for enterprises through strategy implementation and advanced planning.

关键词

电力工程企业/战略管理/业务转型

Key words

electric engineering enterprise/strategy management/business transformation

分类

能源科技

引用本文复制引用

丁鹏,庞可..浅析电力工程企业通过战略破局冲出发展"天花板"[J].电力勘测设计,2025,(1):1-5,5.

电力勘测设计

1671-9913

访问量0
|
下载量0
段落导航相关论文