电力勘测设计Issue(1):16-20,5.DOI:10.13500/j.dlkcsj.issn1671-9913.2025.01.004
软基条件下风机吊装平台主吊站位地基处理研究
Research on Ground Treatment of the Main Crane Station of the Wind Turbine Hoisting Platform under Soft Ground Conditions
徐皇冈 1欧杰 1张云杰1
作者信息
- 1. 湖北省天顺零碳技术有限公司,湖北 武汉 430062
- 折叠
摘要
Abstract
The ground treatment plan for the main lifting station of the wind turbine lifting platform under soft foundation conditions directly affects the construction safety,construction cost,and project schedule of wind power projects.This article proposes a combined ground treatment plan of rubble replacement,dense laying of steel rows,and roadbed steel plates.Through theoretical calculations and engineering practice,the safety,reliability,technical economy,and construction convenience of this combination scheme have been verified.And it is pointed out that the layered summation method for calculating foundation settlement does not consider the characteristics of wind turbine hoisting and the impact of platform back-filling process,and using the Skempton-Billon method to calculate instantaneous settlement is more in line with the actual situation.It provides reliable theoretical support and implementation experience for engineering practice,and has good economic and social benefits and guiding significance.关键词
软土地基/风机吊装平台/毛石换填/组合地基处理方案/地基沉降/分层总和法/瞬时沉降Key words
soft ground/wind turbine hoisting platform/rubble replacement method/composite foundation treatment plan/foundation settlement/layerwise summation method/inmediate settlement分类
信息技术与安全科学引用本文复制引用
徐皇冈,欧杰,张云杰..软基条件下风机吊装平台主吊站位地基处理研究[J].电力勘测设计,2025,(1):16-20,5.