| 注册
首页|期刊导航|水力发电学报|水电工程施工工序的概算定额智能绑定方法

水电工程施工工序的概算定额智能绑定方法

庞小荣 刘全 孟歆 刘杰元 李心睿

水力发电学报2025,Vol.44Issue(1):30-40,11.
水力发电学报2025,Vol.44Issue(1):30-40,11.DOI:10.11660/slfdxb.20250103

水电工程施工工序的概算定额智能绑定方法

Intelligent method for binding construction process and budget estimate in hydropower projects

庞小荣 1刘全 1孟歆 1刘杰元 1李心睿2

作者信息

  • 1. 武汉大学 水资源工程与调度全国重点实验室,武汉 430072
  • 2. 中国电建集团成都勘测设计研究院有限公司,成都 610072
  • 折叠

摘要

Abstract

Budget estimate quotas and mechanical quotas are the basis of construction resource analysis and engineering budget estimate compilation.Traditional manual binding of the process and quota is inefficient,cumbersome and error-prone.Based on establishing a quota paradigm database,this paper presents a new intelligent binding method for budget estimate quotas of construction process by using information retrieval and natural language processing technologies.For the budget estimate quotas with positive and negative relevance,a fuzzy retrieval model is developed using the morpheme segmentation of text keywords and combining Word2vec semantic analysis with inverse document frequency weights.And we construct a priori cascading search method for budget estimate quotas in response to the characteristics of hierarchical search of the quotas.Experiments show that the retrieval model achieves a recall precision of 92.29%for budget estimate quotas and 97.28%for construction machinery hourly rate quotas,and the search method reduces design man-hours significantly.Application of this binding method will be a strong support to intelligent designs in hydropower engineering.

关键词

设计概算/定额绑定/自然语言处理/信息检索/词义分析

Key words

design budget estimate/quota binding/natural language processing/information retrieval/semantic analysis

分类

建筑与水利

引用本文复制引用

庞小荣,刘全,孟歆,刘杰元,李心睿..水电工程施工工序的概算定额智能绑定方法[J].水力发电学报,2025,44(1):30-40,11.

基金项目

国家自然科学基金面上项目(51879147) (51879147)

水力发电学报

OA北大核心

1003-1243

访问量0
|
下载量0
段落导航相关论文