深江铁路虎跳门特大桥混凝土板-钢桁组合梁斜拉桥总体设计

刘振标 胡方杰 夏正春 印涛

铁道标准设计2025,Vol.69Issue(2):67-74,8.
铁道标准设计2025,Vol.69Issue(2):67-74,8.DOI:10.13238/j.issn.1004-2954.202306190003

深江铁路虎跳门特大桥混凝土板-钢桁组合梁斜拉桥总体设计

Overall Design of Concrete Slab-steel Truss Composite Girder Cable-stayed Bridge for Hutiaomen Channel Super Major Bridge of Shenzhen-Jiangmen High-speed Railway

刘振标 1胡方杰 1夏正春 1印涛1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,武汉 430063
  • 折叠

摘要

Abstract

The Hutiaomen Channel Super Major Bridge is one of the key projects in the construction of the new Shenzhen to Jiangmen Railway,featuring a main span of 300 meters as a cable-stayed bridge.To study the optimal structural form,composite box girder,hybrid box girder,and concrete slab-steel truss composite beam are compared.The concrete slab-steel truss composite beam shows significant advantages in terms of landscape integration,wind resistance and economy,making it the recommended solution.Key technological research is conducted on the concrete slab-steel truss composite beam,with the objective of minimizing steel usage by determining critical structural design parameters.The structural behavior is analyzed to derive the distribution of internal forces in the components.The shear hysteresis effect of the"Π"-shaped wide slab is also examined.The research results indicate that when the ratio of the cross-sectional area of the lower chord steel structure to the concrete slab reaches about 1.2%,the steel usage of the main girder reaches the minumum.At this point,the concrete slab bears approximately 90%of the axial force,about 70%of the shear force at the nodes with stay cables,and about 40% of the shear force at the nodes without stay cables.The shear hysteresis coefficient of the concrete slab generally increases from the mid-span to the bridge tower support,with values ranging from 1.02 to 1.16 under dead load and 1.09 to 1.22 under live load.The main girder exhibits excellent wind resistance and running performance,and will not become a speed control point for the entire railway line.

关键词

高速铁路/斜拉桥/总体设计/设计参数/内力分配/剪力滞效应

Key words

high-speed railway/cable-stayed bridge/overall design/design parameters/internal force distribution/shear lag effect

分类

交通工程

引用本文复制引用

刘振标,胡方杰,夏正春,印涛..深江铁路虎跳门特大桥混凝土板-钢桁组合梁斜拉桥总体设计[J].铁道标准设计,2025,69(2):67-74,8.

基金项目

中国国家铁路集团有限公司科技研究开发计划项目(N2021G034) (N2021G034)

中铁第四勘察设计院集团有限公司科技研发项目(2022K030,2022K109) (2022K030,2022K109)

铁道标准设计

OA北大核心

1004-2954

访问量1
|
下载量0
段落导航相关论文