| 注册
首页|期刊导航|铁道科学与工程学报|极软岩大变形隧道交叉口段主被动支护技术应用

极软岩大变形隧道交叉口段主被动支护技术应用

皮圣 范晓锋 王明年 梁禹

铁道科学与工程学报2025,Vol.22Issue(1):221-234,14.
铁道科学与工程学报2025,Vol.22Issue(1):221-234,14.DOI:10.19713/j.cnki.43-1423/u.T20240465

极软岩大变形隧道交叉口段主被动支护技术应用

Active and passive support technologies applied at intersection of soft rock tunnel with large deformation

皮圣 1范晓锋 2王明年 3梁禹4

作者信息

  • 1. 西南交通大学 土木工程学院,四川 成都 610031||川藏铁路有限公司,四川 成都 610043
  • 2. 中山大学 土木工程学院,广东 珠海 519082
  • 3. 西南交通大学 土木工程学院,四川 成都 610031
  • 4. 中山大学 土木工程学院,广东 珠海 519082||隧道工程灾变防控与智能建养全国重点实验室,广东 广州 510275
  • 折叠

摘要

Abstract

The control measures for soft rock tunnels with large deformation primarily encompass passive support technologies is often characterized by rigid steel frame and composite linings.Active support technologies is exemplified by high-strength prestressed anchor(cable),multi-layered support deformation control technologies combined with active and passive support,as well as yielding support technologies.However,the selection of supports in practical engineering remains a challenging problem.Based on a railway tunnel project with extremely soft surrounding rock in southwest China,this paper investigated the utilization of active and passive comprehensive support technique to address the issues of continuous deformation and instability of supporting structures during ripping construction at intersection.Additionally,the contact pressure between the primary and secondary lining,the pressure of steel pipe columns,the deformation of primary support structure and the stress of secondary lining were monitored and analyzed.The results are drawn as follows.The implementation of"double primary support+Φ325 steel pipe column support"passive support in the intersection section effectively mitigates rapid arch settlement of initial support.The 20 m long Φ76 self-drilling long anchor pipes have been adopted at the arch for active reinforcement,achieving"anchoring replacing supporting".High-stiffness I25b single-layer initial support are used for rapid enclosure,providing early support resistance to restrict continuous deformation of the surrounding rock.3 m/6 m short secondary lining lock is quickly constructed in accordance with the principle of"partition construction and lining closure",which can control the long-term creep of surrounding rock.It took 275 days to complete the second lining construction at the intersection section,which relieved the risk of continuous deformation and instability of the support structures.The successful application of this comprehensive support technique can provide valuable references for similar projects.

关键词

铁路隧道/极软岩大变形/交叉口/钢管立柱支撑/以锚代撑/主被动支护

Key words

active and passive supports/anchor replacing temporary supporting/intersection/large deformation of extremely soft rock/railway tunnel/steel pipe column supports

分类

交通运输

引用本文复制引用

皮圣,范晓锋,王明年,梁禹..极软岩大变形隧道交叉口段主被动支护技术应用[J].铁道科学与工程学报,2025,22(1):221-234,14.

基金项目

国家自然科学基金资助项目(52378427) (52378427)

广东省自然科学基金资助项目(2023A1515030258,2024A1515012623) (2023A1515030258,2024A1515012623)

铁道科学与工程学报

OA北大核心

1672-7029

访问量0
|
下载量0
段落导航相关论文