首页|期刊导航|港口航道与近海工程|面向浮拖安装的大型组块码头顶升结构设计与研究

面向浮拖安装的大型组块码头顶升结构设计与研究

章文瀚

港口航道与近海工程2025,Vol.62Issue(1):55-58,4.
港口航道与近海工程2025,Vol.62Issue(1):55-58,4.DOI:10.16403/j.cnki.ggjs20250111

面向浮拖安装的大型组块码头顶升结构设计与研究

Design and Research of Jacking Structure for Large Block Wharf Erected by Using Float Tow

章文瀚1

作者信息

  • 1. 中交第一航务工程勘察设计院有限公司,天津 300220||天津市海岸与近海工程岩土与结构重点实验室,天津 300222
  • 折叠

摘要

Abstract

With the decrease of oil&gas resources on land,the exploration of offshore oil&gas resources gradually moves to open sea,and the offshore drilling rig is developed to be an integrated platform with multi-functions.The weight and volume of the upper blocks increase up to the level of tens of thousands tons.Large module results in a great difficulty in offshore erection,which produces float-tow technology.The technology must meet the requirement of jacking the large module up to a height of more than 10 m above ground level,and placing it on a DSF frame,which involves the research and development of a jacking device within a large displacement range.By analyzing the characteristics of large maritime module,based on hydraulic jacking technique,a set of 90° two-station frame mechanism was designed,which coordinated with four upper support caps to achieve a large displacement jacking of more than 10 meters.The core components of the jacking mechanism were analyzed by using finite element method under the extreme working condition,the results complied with the demands for the design of mechanism strength.

关键词

连续顶升结构/浮拖安装/有限元分析/大型油气模块

Key words

continuous jacking structure/float-tow erection/finite element analysis/large oil&gas module