首页|期刊导航|净水技术|光伏工业园区含氟废水处理工艺调试实例

光伏工业园区含氟废水处理工艺调试实例

唐玮曦 陆文超 王乾坤 王旭 李艾岭

净水技术2025,Vol.44Issue(1):128-134,7.
净水技术2025,Vol.44Issue(1):128-134,7.DOI:10.15890/j.cnki.jsjs.2025.01.016

光伏工业园区含氟废水处理工艺调试实例

An Empirical Study on Process Operation and Debugging of Fluorine-Containing Wastewater in Photovoltaic Industrial Park

唐玮曦 1陆文超 2王乾坤 1王旭 3李艾岭3

作者信息

  • 1. 江苏中鹏环保集团有限公司,江苏南京 210019||来安金鹏水务有限公司,安徽滁州 239236
  • 2. 江苏中鹏环保集团有限公司,江苏南京 210019
  • 3. 来安金鹏水务有限公司,安徽滁州 239236
  • 折叠

摘要

Abstract

[Objective]Introduce the commissioning and operation process of a fluoride wastewater treatment project in a photovoltaic industrial park,and focus on the commissioning situation of reducing the fluoride ion mass concentration in the wastewater from 8 mg/L to 1.5 mg/L.[Methods]In view of the water quality characteristics of the wastewater discharged in the photovoltaic industrial park,the commissioning is carried out in two steps:biochemical commissioning and physical and chemical commissioning.After the biochemical commissioning,the physical and chemical debugging is further carried out for CODCr and fluoride ions that cannot be removed through the biochemical process.The key point of the commissioning process is to remove the fluoride ions in the wastewater by physical and chemical means,and to obtain better fluoride ion removal effect and lower removal cost by regulating the dosage and adjusting the dosage point.[Results]After the completion of the biochemical commissioning,the initial use in the biochemical pool front coagulation sedimentation tank step except fluorine treatment measures,found the need to add large dosage,agent add the amount of sludge is too large,and large amount of sludge cannot fully precipitation and overflow to the subsequent biochemical process section,sludge fluoride ion in the biochemical section will decomposition and back to the wastewater,which affect the effect of fluoride system,make fluoride ion in the subsequent treatment facilities.For this reason,the measure of adding agents step by step is adopted,and the agent injection is divided into two points:the front end coagulation sedimentation tank and the biochemical efficient sedimentation tank,and the fluoride sludge of the high efficiency sedimentation tank is returned to the front end to further play the role of fluoride removal,which effectively reduces the dosage of fluoride removal and stabilizes the fluoride ion index of the effluent water.[Conclusion]Through the commissioning of biochemical physical.

关键词

光伏/含氟废水/氟离子/除氟剂/地表Ⅳ类水

Key words

photovoltaic/fluorine-containing wastewater/fluorine ion/defluorinating agent/class Ⅳ surface water