The article takes the bridge construction project of Dazhou village on the road from the Yangxi county town to Xitou along the river as an example,briefly explains the geological conditions of strongly weathered granite in the project,and combines the difficulties of steel pipe pile sinking construction to propose construction technology application measures to solve the welding and anti-corrosion processing deviation of steel pipe piles,lifting deviation of steel pipe piles,and pile tip fracture.The construction effect is analyzed to provide reference for relevant workers.关键词
强风化花岗岩/复杂地质/钢管桩沉桩Key words
Strongly weathered granite/Complex geology/Steel pipe pile sinking分类