摘要
Abstract
In order to solve the construction difficulties of tight construction schedule,high quality requirements,and limited construction budget in high-rise buildings,this article takes the Taigu Xuefu project in Jinzhong City as the background and takes the 17#building as an ex-ample to creatively introduce the aluminum alloy formwork early dismantling system.Through key technical analysis and practical application.The results show that aluminum alloy templates based on the early dismantling system can effectively save construction time,strengthen con-struction quality,improve economic efficiency,significantly reduce costs and increase efficiency,and are worth promoting.关键词
铝合金模板/早拆体系/体系验算Key words
Aluminum alloy template/Early dismantling system/System verification分类
建筑与水利